This study demonstrates that applying heuristic line-balancing techniques (LCR, RPW, and K&W) to a polypropylene bag manufacturing line in Ethiopia can theoretically reduce workstations by 40% and increase daily output by approximately 45% by optimizing task allocation from a five-station to a three-station configuration.

Original authors: Moges mabre Desalew, Mengistu Manaye, Abraham Asmamaw, Alie Wube, Husien Ababu

Published 2026-11-26
📖 5 min read🧠 Deep dive

Original authors: Moges mabre Desalew, Mengistu Manaye, Abraham Asmamaw, Alie Wube, Husien Ababu

Original paper licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). ✨ This is an AI-generated explanation of the paper below. It is not written or endorsed by the authors. For technical accuracy, refer to the original paper. Read full disclaimer

In the world of making things, the speed of a factory is often held back not by the machines, but by the people. Imagine a line of workers where one person is constantly rushing while the person next to them sits waiting for parts to arrive. This uneven flow creates a bottleneck, a jam that slows down the entire operation and leaves valuable time wasted. The goal of industrial engineering is to smooth out these bumps, ensuring that every worker has just enough to do so that the work moves forward without pause. This is known as line balancing. It is a method of rearranging tasks so that the workload is shared as evenly as possible, turning a chaotic stream of activity into a steady, efficient current. When done correctly, a factory can produce far more goods using the same number of people, simply by organizing the work better.

In a polypropylene bag factory in Kombolcha, Ethiopia, researchers found that such a jam was holding back production. The factory makes large bags used for packaging flour, grain, and salt, and while it has the capacity to produce thousands daily, the finishing section—the final stage where bags are cut, stitched, counted, and packed—was struggling. The workers were moving back and forth over long distances, waiting for materials, and dealing with uneven workloads. Some stations were overwhelmed while others sat idle. To fix this, a team of engineers from Wollo University decided to apply a set of simple, logical rules to reorganize the line. They focused on the most popular bag size, measuring exactly how long each step took and mapping out the order in which the steps had to happen.

The researchers started by watching the workers closely, using a stopwatch to time nine distinct tasks, from cutting the fabric to the final packaging. They calculated the precise time needed for each job, accounting for the speed of the workers and adding a small buffer for rest and delays. They discovered that the total time to make one bag was just under thirty-eight seconds. The factory had set a target to produce 5,500 bags a day, which meant each bag needed to move through the line every fourteen and a half seconds. With this target in mind, the team asked a simple question: what is the fewest number of workstations needed to keep this pace? The math showed that, theoretically, the entire line could be run with just three stations. The challenge was to see if the specific order of the tasks allowed for such a tight arrangement.

To solve this puzzle, the team tested three different methods of assigning tasks, each using a slightly different way of deciding which job goes where. One method simply picked the longest jobs first. Another looked at which jobs had the most other jobs waiting behind them. The third arranged tasks based on their position in the sequence of operations. Surprisingly, all three methods led to the exact same solution. They found that the work could indeed be grouped into just three stations. The first station would handle the initial cutting and the top stitching. The second station would take over the bottom stitching, trimming, counting, and feeding the bags into the printing machine. The third station would be dedicated solely to the final packaging, which is the longest single task.

This new arrangement offered a dramatic improvement. The factory had previously been using five separate stations with eighty operators, but the work was so unevenly distributed that the line was only about sixty-nine percent efficient. The new three-station plan, using the same eighty operators, would raise that efficiency to eighty-seven percent. By removing the unnecessary stops and long walks between stations, the line would no longer be stuck waiting for the slowest step. The researchers calculated that this change could increase the daily output from roughly 56,000 bags to over 81,000 bags. This represents a potential increase in production of nearly forty-five percent without hiring a single new worker or buying new machinery.

The study highlights that the biggest gains often come from organization rather than investment. The main bottleneck in the old system was the upper stitching area, where too many workers were crowded around a single task while others waited. By combining the cutting and stitching into one station and grouping the smaller, faster tasks together in the middle, the flow became smooth. The researchers noted that the three different methods they tried all arrived at the same result, suggesting that for this specific type of work, simple rules are just as effective as complex calculations. This is a significant finding for factories in developing economies, where resources are limited and the ability to quickly improve productivity with low-cost tools is essential.

However, the researchers are careful to note that these numbers represent a calculated potential, not a guaranteed reality. The new line has not yet been built or tested in the factory. The figures are based on a model that assumes everything goes exactly as planned, without unexpected machine breakdowns or worker absences. To know for sure if the production will actually jump to 81,000 bags, the factory would need to physically rearrange the line and run it for a while to see how it performs in the real world. Until then, the study stands as a strong demonstration of how applying basic principles of work organization can unlock hidden capacity in a factory, proving that sometimes the most powerful tool for improvement is simply a better way of thinking about the work itself.