Evaluating the Role of Bills of Quantities in Contract Management: Evidence from State- Owned Enterprises in the Maldives
This study evaluates the critical yet constrained role of Bills of Quantities (BOQs) in managing construction contracts within Maldivian State-Owned Enterprises, identifying institutional and operational barriers that hinder their effectiveness while proposing a tailored framework and strategic interventions to enhance procurement transparency, accountability, and efficiency in Small Island Developing States.
Original paper licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). This is an AI-generated explanation of the paper below. It is not written by the authors. For technical accuracy, refer to the original paper. Read full disclaimer
The Big Picture: Building an Island Nation with a Shaky Blueprint
Imagine the Maldives as a giant puzzle made of 1,190 tiny islands scattered across the ocean. The government (specifically the State-Owned Enterprises, or SOEs) is trying to build bridges, airports, and houses to connect these islands. But because the islands are so far apart and everything has to be shipped in from other countries, building things there is incredibly tricky and expensive.
The paper argues that to build these projects successfully, the government needs a very specific tool called a Bill of Quantities (BOQ).
What is a "Bill of Quantities" (BOQ)?
Think of a BOQ as the ultimate, super-detailed shopping list and instruction manual for a construction project.
- Without a BOQ: It's like telling a contractor, "Build me a house," and hoping they guess how many bricks, bags of cement, and hours of labor you need. This leads to confusion, the contractor charging you extra later, or running out of money halfway through.
- With a BOQ: It's like saying, "Here is the exact list: 5,000 bricks, 200 bags of cement, 400 hours of labor, all priced exactly." Everyone agrees on the list before the work starts.
The Main Problem: The List is Often Written Wrong
The paper finds that while the Maldives uses these lists, they aren't always doing it right. Here are the main issues, explained simply:
- The Wrong Chef is Cooking: Usually, a specialized "Quantity Surveyor" (a professional accountant for construction) should write the list. But in the Maldives, there aren't enough of these experts. So, engineers often write the lists instead.
- Analogy: It's like asking a mechanic to write a recipe for a gourmet dinner. They might know how to fix a car, but they might get the spices wrong. This leads to mistakes in the numbers.
- The "Island Tax": Because the Maldives is an island nation, shipping materials is a nightmare. The paper says the lists often forget to account for the extra cost and trouble of moving things between islands.
- Analogy: If you order a pizza, the price is $15. But if you live on a boat in the middle of the ocean, the delivery fee is $50. If your "shopping list" only says $15, you are going to be shocked when the bill arrives.
- No Standard Rules: Different government agencies use different ways to measure things. One agency might measure a wall in "feet," another in "meters," and a third might just guess.
- Analogy: It's like trying to play a game of Monopoly where one player uses real money, another uses play money, and a third uses candy. You can't compare bids or track who is winning.
Why Does This Matter? (The Consequences)
When the "shopping list" (BOQ) is messy or wrong, bad things happen:
- Cost Overruns: The project costs way more than planned because the initial list was wrong.
- Fights and Lawsuits: The government and the construction company argue over who owes what money.
- Delays: Projects get stuck because no one agrees on the price of the extra work needed.
The Solution: A Better Way to Build
The authors suggest a few fixes to make the system work better:
- Hire the Pros: Make it a rule that only qualified "Quantity Surveyors" can write these lists for big government projects.
- Use the Same Rulebook: Everyone should use the same international measurement standards (like a global rulebook for construction) so everyone speaks the same language.
- Go Digital: Instead of writing lists on paper (which is slow and prone to errors), use computers and 3D models (like a video game version of the building) to count the bricks and beams automatically.
- Double-Check Everything: Before a contractor starts bidding, someone needs to check the list for errors.
The Bottom Line
The paper concludes that the Bill of Quantities is the most important tool for keeping the government's money safe and ensuring projects get built on time. However, in the Maldives, this tool is currently being used by people who aren't fully trained, and the unique challenges of island life make the job even harder.
If the Maldives wants to build better infrastructure without wasting money or getting stuck in legal fights, they need to treat the "shopping list" with more respect, hire the right experts, and use modern technology to make sure the numbers add up.
Drowning in papers in your field?
Get daily digests of the most novel papers matching your research keywords — with technical summaries, in your language.